Instructions / Assembly
© Vertex Services Limited, 2011
1
3
5
2
4
6
Note: double-up
studding at front for
Cam and Shower Door
installation (refer to
Steps 14 and 24)
Ensure allowance is
made for Backer Board
material and Allure Natural
Stone Wall panels, when
laying out plumbing
allowance for shower head
allowance for faucet
Prior to installing backer
board material, apply sealant
to the moisture barrier sealing
strips on all three sides of the
Allure Shower Pan
Dry fit Allure Shower
Pan to ensure proper fit and
spacing before using mortar
cement to install Shower Pan
36”
36”
84”
(minimum)
Recommended for use:
Custom Building Products
SpeedSet Fast-Setting
Thin-Set Mortar Grey
Recommended for
use: Phenoseal or DAP,
Kitchen and Bath
Sealant, Clear
HANDY HINT
Install backer board material on side
shower walls first, then back wall.
SWP Instructions English-French.indd 2 11/16/11 3:37 PM






