Specifications
3
Revised August 24, 2017
Score top of the plank with
utility knife and square
Install cut edge
against the wall
Cut line
Bend and back cut
tape with utility knife
and snap off
Installation
Acclimate 24-48 hours
at 60° F to 85° F
(15° C to 30° C)
Do not remove planks from cartons
24
-
48
hrs
Add ceiling & base
board trim if desired
Roll entire wall after
installation and then
again 24 hours later
1
ACCLIMATE
Center point of wall
Height of wall ÷ 5"
= number of rows
Adjust start line so top
or bottom row is never
less than 3". Then, snap
level chalk line.
Wall shown
is without
ceiling and
base board
trim installed
8 foot high wall (96") = 3" row on top and bottom rows + 18 full 5" rows
9 foot high wall (108") = 3" row on top or bottom row + 21 full 5" rows
10 foot high wall (120") = 24 full 5" rows.
2
FIND YOUR STARTING POINT
Place first plank gently into
place. Make sure it is level. If
not level, reposition until level,
then roll with J Roller
Dry-fit planks before
peeling release paper
to ensure best fit and
desired appearance
Peel release
paper off
three rows
of tape
Side View
For best appearance,
install planks from 2-3
cartons at one time
Roll planks as you
go with J Roller
4
CUTTING PLANKS
5
USE MULTIPLE CARTONS
3
INSTALL FIRST PLANK
6
FINISH INSTALL
The steps below represent a wall installation using the traditional Horizontal design option as seen in the previous section (Design Options).
Use these same steps for a ceiling installation.






