Installation Instructions

Allura Fiber Cement Siding Installaon Manual
41
Fascia, Band and Frieze Boards, and Rakes
o i n s t a l l i b e r e m e n t a s i a
Install the fascia over a wood substrate.
Butt the ends of the fascia and nail it every 12” to 16”.
 asia an also be installed as band boards riee boards and raes
Install trim over wood substrate.
Band Boards:
Install  iber ement trim oer urring stris it te aroriate lasing
Butt the ends of the trim and nail every 12” to 16”.
Rakes and Frieze Boards:
Butt the ends of the trim and nail through the trim substrate and siding into the
framing or into a wood substrate every 12” to 16”.
eae beteen te siding and te trimenou install te siding
Caulk between the siding and the trim.
Secon 10: Lap Siding
Before you install the siding, review and comply with all local building codes and
regulations regarding wall construction including the proper use of framing, weather-
resistant barriers, flashings, and other building materials and systems.