Installation Instructions

INSTALLATION:
MaxiSOFFIT
TM
panels must be fastened to a solid, nailable substrate such as wood 2x subfascia.
Additional framing may be needed to ensure proper fastening.
An insect screen can be installed using building adhesive, but the net ventilation will be reduced.
JOINTING METHODS:
Install Max iSOFFIT
TM
panels in moderate contact at ends or leave 1/8 gap and caulk.
Maintain a minimum 1 gap between gutter end caps and siding & trim.
KICKOUT FLASHING:
Because of the volume of water that can pour down a sloped roof, one of the most critical ashing details
occurs where a roof intersects a sidewall.
The roo
ashed with st ashing. Where the roof terminates, install a kickout of su cient length
and in a direct angle that allows the water to run down the roof, away from the siding.
It is best to install a self-adhering membrane on the wall before the subfascia and trim boards are nailed in
place, and then come back to install the kickout.
4 MaxiSOFFIT
TM
| www.maxitile.com