Establish a Chalk Line
1. Find the lowest point of the sheathing(s) and make a mark that is 1” above the
loest orner e bottom edge o te siding ill be belo te mar ou ust
made. Make sure this point is high enough to ensure that the bottom edge of the
siding is installed at least 6” above the finished grade or 1” above surfaces where
water may collect.
2. From this mark, snap a level chalk line to the opposite end of the wall.
3. Repeat the procedure around the entire house.
Aligning the Starter Strip
You must use a starter strip with lap siding. Except when using vinyl undersill trim as a
starter te starter stri must be a minimum o ide and to ti
Align the top of the starter strip with the chalk line and fasten.
Installing the First Course
Using the starter strip as a guide, position the bottom edge of the first course of
la siding so tat te bottom edge angs belo te bottom o te starter stri
eae a ga beteen te siding and te trim or oter materials to allo or
structural movement. Always caulk between the siding and the trim.
NOTE: When installing Allura Fiber Cement Siding into a J-channel or other receiving
channel, ensure that all cut edges have been re-sealed with primer or paint prior to
insertion; do not caulk between the siding and the channel, either before or after
siding installation as this may restrict water movement around the opening. Make sure
all corners are properly flashed.