Owner`s manual

2
Pre-Installation Notes ........................................ 3
Operator Class Information ............................... 3
Section A: Gate System Design/Installation ... 4
Section B: Preparing the Site ........................... 6
The Concrete Operator Pad ......................... 6
Electrical Power Requirements ................... 6
Attaching the Chain Bracket ....................... 7
Placing Vehicle Detector Loops .................. 7
Section C: Installing the Operator ................... 9
Placing the Tower Operator ........................9
Electrical Hookup ......................................... 9
Accessory Equipment Hookup ...................9
Wiring Radio Receivers ............................. 10
Wiring a 3 Button Station .......................... 10
Wiring Vehicle Detectors ........................... 11
Wiring Keypad or Telephone Entry ........... 11
Wiring Diagram .......................................... 11
Final Installation Checklist ........................ 12
Terminal Strip Reference Chart12
TABLE OF CONTENTS
READ THESE STATEMENTS CAREFULLY AND FOLLOW THE
INSTRUCTIONS CLOSELY.
The Warning and Caution boxes throughout this manual are there to protect you and
your equipment. Pay close attention to these boxes as you follow the manual.
WARNING
Indicates a MECHANICAL
hazard of INJURY OR
DEATH. Gives instructions
to avoid the hazard.
CAUTION
Indicates a MECHANICAL hazard
of DAMAGE to your gate, gate
operator, or equipment. Gives
instructions to avoid the hazard.
Indicates an ELECTRICAL
hazard of INJURY OR
DEATH. Gives instructions
to avoid the hazard.
WARNING
Indicates an ELECTRICAL hazard
of DAMAGE to your gate, gate
operator, or equipment. Gives
instructions to avoid the hazard.
CAUTION
Figure 1
WARNING HIGH VOLTAGE
ONLY A QUALIFIED TECHNICIAN SHOULD SERVICE THIS GATE OPERATOR
PERIODICALLY TEST SENSITIVITY OF OVERLOAD
*** READ MANUAL ***
DATES OPERATOR
DATE TESTED DATE TESTED DATE TESTED DATE TESTED
SERVICED
LOG DATE OVERLOAD TEST
Section D: Starting the Operator ...........................13
Left/Right Hand Installations ............................13
Synchronous Operation (Master/Slave) ...........14
Mounting the Limit Cams ..................................14
Presetting the Sensitivity Adjustment ..............15
Timer To Close Adjustment ..............................15
Pre-Power On Checklist ....................................15
Final Settings .....................................................16
Maximum Run Timer ..........................................16
Section E: Installation Notes for Auxiliary
Equipment ..........................................................16
Section F: End User Instructions ..........................17
Operational Guide for the End User .................17
Safety Guide for the End User ..........................17
Operator Exploded View & Parts List .....................19
Technical Specifications .........................................20
Warranty ...................................................................20