Installation guide

Chapter 3: Preparing the Switches
58
5. Enter the following command again to verify the switch’s stack ID
assignment:
show stack
6. Verify that Stack ID is showing the number you assigned the switch in
step 2. If the value is correct, go to the next step. Otherwise, repeat the
procedure starting with step 2.
7. Power off the switch.
Repeat the procedures in this chapter on the other switches of the stack.
Afterwards, go to the next chapter for instructions on how to cable and
power on the stack.