Installation Overview
Table 7 lists the installation procedures for a stack of the AT-9424Ts,
AT-9424Ts/XP, and AT-9448Ts/XP Switches. The procedures, which are
divided into four chapters, should be performed in the order presented in
the table. Allied Telesis recommends that you print this table and place a
check mark beside the procedures as you complete them.
Table 7. Installation Procedures
Step Procedure
Chapter 2, “Installing the Hardware”
1 Refer to “Reviewing the Safety Precautions” on
page 34
2 Refer to “Planning the Installation of a Stack” on
page 36
3 Refer to “Maximum Number of Switches in a
Stack” on page 37
4 Refer to “Unpacking a Switch” on page 38
5 Refer to “Installing the AT-StackXG Stacking
Module” on page 39
6 Refer to “Installing the Power Cord Retaining Clip
(AC Switches Only)” on page 42
7 Refer to “Disconnecting the Network Cables” on
page 43
8 Refer to “Installing the Switches in an Equipment
Rack” on page 44
9 Refer to “Labeling the Switches” on page 46
Chapter 3, “Preparing the Switches”
10 Refer to “Powering on a Switch” on page 48
11 Refer to “Starting a Local Management Session”
on page 50
12 Refer to “Verifying the AT-S63 Version Number”
on page 52
13 Refer to “Updating the AT-S63 Management
Software” on page 53
14 Refer to “Assigning the Static Module ID Number
1 to the Master Switch” on page 54