Installation guide
2-1
Chapter 2
Installation and Setup
This chapter describes the following:
"
How to decide where to install the switch
"
Gigabit Ethernet configuration rules
"
How to install the switch in a rack or free-standing
"
How to connect equipment to the console port
"
How to check the installation using the Power On Self-Test (POST)
Following Safety Information
Before installing or removing any components of the switch, or before carrying out
any maintenance procedures, you must read the safety information provided in
Appendix A of this guide.
Verifying the Switch Package
Check your package for the following contents:
"
One gigabit Ethernet switch (AT-9108, AT-8518, AT-8525 or AT-8550)
"
Two rackmount brackets and eight flathead screws
"
Four self-adhesive rubber feet
"
One power cord
"
This installation guide
"
One warranty card
If any of the above items are damaged or missing, contact your Allied Telesyn
representative.