Specifications

13
Chapter 2
Hardware Installation
Installing the TurboStack hubs without management capability simply
involves plugging the hub into a power source. Additional specific
information on installing the hub in a department concentrator chassis is
in the manual included with the chassis.
Additional specific information about installing TurboStack hubs in a
department concentrator chassis is contained in the TurboStack™ AT-S10
Firmware Module for TurboStack Hubs Operations Manual available
through your ATI sales representative.
Site Preparation
Attention
Before installing TurboStack hubs, read the Electrical Safety and
Installation Requirements starting on page i.
Location Each of the TurboStack hubs without management can operate as a
standalone product, or installed in a rackmount or desktop chassis.
Multiple hubs can be combined in an ATI chassis.
Ventilation The site must have adequate ventilation to provide an operating
environment consistent with TurboStack specifications. Chassis models
also are equipped with fans to aid in cooling. For the fans to function
correctly, you must not block the ventilation openings located on the sides
of the chassis.
Note
Maximum ambient temperature is 40
o
C with a department concentrator
chassis.
Power Power connections for each hub should be able to provide 50 watts at 120
VAC, for U.S.A. versions; and 100-120/200-240 VAC, 50/60Hz for
international versions. It is not uncommon to use dedicated power circuits
or power conditioners to supply power to the network devices. This aids in
isolating the network equipment from electrical power “noise.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com