User guide

Table Of Contents
6-16 Inter-office leased line connection
8. The Test Results page (Figure 6-13) shows a summary of which tests have
been performed and the results. It takes a few seconds to run the tests.
Figure 6-13: Test Results page
If all the tests succeeded, click OK to return to the Configuration Sum-
mary for Inter-office Leased Line connection (Figure 6-12).
If any tests failed, note the test results (for instance, by printing out the
Test Results page) and see “Connection test fails” on page 10-13. Click
OK to return to the Configuration Summary for Inter-office Leased
Line connection (Figure 6-12).