Specifications
Hardware Reference 27
C613-03020-00 REV N
The Test Facility is built into the AlliedWare operating system, and is the
easiest way to verify a PAC’s operation. To run the test facility for a PAC, use
the command:
enable test interface=pac
The test runs 4 minutes. To view the results of the test at any time, use the
command:
show test
Figure 25 shows a typical output. The status of the test will be shown in the
right-hand column.
If you are unsure about running the Test Facility, or want help evaluating the
results, contact your authorised Allied Telesis distributor or reseller.
Figure 25: Example output from the show test command for a Rapier switch with an AT-AR061 ECPAC installed
Board ID Bay Board Name Rev Serial number
--------------------------------------------------------------------------
Base 86 AT-RP24 Rapier 24 M2-1 46690596
PAC 153 AR061 ECPAC P1-16 6844578
Duration Details
Interface State Result Type (minutes) Data( %OK )
Control
--------------------------------------------------------------------------
port1 no test - - - - - -
port2 no test - - - - - -
port3 no test - - - - - -
port4 no test - - - - - -
port5 no test - - - - - -
port6 no test - - - - - -
port7 no test - - - - - -
port8 no test - - - - - -
port9 no test - - - - - -
port10 no test - - - - - -
port11 no test - - - - - -
port12 no test - - - - - -
port13 no test - - - - - -
port14 no test - - - - - -
port15 no test - - - - - -
port16 no test - - - - - -
port17 no test - - - - - -
port18 no test - - - - - -
port19 no test - - - - - -
port20 no test - - - - - -
port21 no test - - - - - -
port22 no test - - - - - -
port23 no test - - - - - -
port24 no test - - - - - -
enco0 testing wait 4 minutes DES < 1 good(100.0) -
.
enco1 testing wait 4 minutes STAC < 1 good(100.0) -
.
---------------------------------------------------------------------------