User Manual
x600 Layer 3 Gigabit Ethernet Switch Installation Guide
47
3. Position the transceiver with the label facing up.
4. Slide the transceiver into the slot until it clicks into place.
Figure 23. Installing an SFP Transceiver
5. For the x600-24Ts and x600-24Ts/XP switches, verify that the handle
on the SFP transceiver is in the upright position, as shown in
Figure 24, to prevent inadvertently removing the transceiver.
Figure 24. Positioning Handles on the x600-24Ts and x600-24Ts/XP
Switches
1331
23R
24R
CLASS 1
LASER PR
ODUC
T
D/C
L/A
1000 LINK / ACT
FDX
PORT A
C
SFP
21 22
23
24
1331
23R
24R
CLASS 1
LASER PRODUCT
D/C
L/A
1000 LINK / ACT
FDX
PORT AC
SFP
21 22
23
24
SFP Handle