Manual
Table Of Contents
- Contents
- List of Figures
- List of Tables
- Preface
- Chapter 1
- Overview
- Chapter 2 :
- Chapter 3
- Chapter 4
- Chapter 5
- Troubleshooting
- Power LED is Off
- Twisted Pair Port Link LED is Off
- SFP or XFP LED is Off
- Transceiver is Installed but the Status is “Not Present”
- System Fault LED is Blinking
- System Fault LED is Steadily On
- Cannot Establish a Local (Out-of-Band) Management Session
- Switch Functions Intermittently
- Issues with Virtual Stacking Chassis Configuration
- Troubleshooting
- Appendix A

x600 Layer 3 Gigabit Ethernet Switch Installation Guide
67
Unpacking a Switch
To unpack a switch, perform the following procedure:
1. Remove all components from the shipping packages.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Make sure the following components are included in your switch
package. If any item is missing or damaged, contact your Allied Telesis
sales representative for assistance.
One x600 Series Layer 3 Gigabit Ethernet Switch
Two rack-mount brackets
Eight flathead Phillips rack-mount bracket screws
AC power cord (Americas, Australia, EU, Japan, and UK only)
AC power cord retaining clip
Management cable for local management