Figure 50. Positioning the SFP or SFP+ Handle in the Upright Position
7. Connect the fiber optic cable to the transceiver, as shown in Figure 51.
The connector on the cable should fit snugly into the port, and the tab
should lock the connector into place.
Figure 51. Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver
8. Repeat this procedure to install additional transceivers.
SFP Handle