Datasheet
Table Of Contents
- Contents
- Figures
- Tables
- Preface
- Chapter 1
- Overview
- Chapter 2
- Virtual Chassis Stacking
- Chapter 3
- Beginning the Installation
- Chapter 4
- Installing the Switches on a Table or in an Equipment Rack
- Chapter 5
- Verifying the Status of VCStack
- Chapter 6
- Cabling the Stacking Ports
- Chapter 7
- Powering On the Stack
- Chapter 8
- Cabling the Networking Ports
- Chapter 9
- Troubleshooting
- Appendix A
- Technical Specifications

x510 Series Installation Guide for Virtual Chassis Stacking
95
Figure 47. Removing the Dust Plug from an SFP+ Slot
Note
When VCStack is enabled on the switch, slots S1/27 and S1/28 on
the AT-x510-28GTX Switch and slots S1/51 and S1/52 on the AT-
x510-52GTX Switch are reserved as stacking ports and may not be
used for regular SFP or SFP+ transceivers.
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. If you are installing the transceiver in a top slot, position the transceiver
with the Allied Telesis label facing up. If you are installing the
transceiver in a bottom slot, position the transceiver with the label
facing down.
4. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 48 on page 96.