Datasheet
Table Of Contents
- Contents
- Figures
- Tables
- Preface
- Chapter 1
- Overview
- Chapter 2
- Virtual Chassis Stacking
- Chapter 3
- Beginning the Installation
- Chapter 4
- Installing the Switches on a Table or in an Equipment Rack
- Chapter 5
- Verifying the Status of VCStack
- Chapter 6
- Cabling the Stacking Ports
- Chapter 7
- Powering On the Stack
- Chapter 8
- Cabling the Networking Ports
- Chapter 9
- Troubleshooting
- Appendix A
- Technical Specifications

Chapter 6: Cabling the Stacking Ports
78
Figure 38. Connecting the Fiber Optic Cable to the Stacking Transceiver
7. Repeat this procedure if the switch is to have two stacking
transceivers.
8. Repeat this procedure on the other switches of the stack to install their
stacking transceivers. The connections must crossover such that a
transceiver in slot 1 connects to a transceiver in slot 2.
9. After you connect the stacking cables to all the switches, go to Chapter
7, “Powering On the Stack” on page 79.