Datasheet
Table Of Contents
- Contents
- Figures
- Tables
- Preface
- Chapter 1
- Overview
- Chapter 2
- Virtual Chassis Stacking
- Chapter 3
- Beginning the Installation
- Chapter 4
- Installing the Switches on a Table or in an Equipment Rack
- Chapter 5
- Verifying the Status of VCStack
- Chapter 6
- Cabling the Stacking Ports
- Chapter 7
- Powering On the Stack
- Chapter 8
- Cabling the Networking Ports
- Chapter 9
- Troubleshooting
- Appendix A
- Technical Specifications

x510 Series Installation Guide for Virtual Chassis Stacking
75
Cabling Switches with AT-StackOP/0.3 or AT-StackOP/9.0
Transceivers
For guidelines to cabling the switches with AT-StackOP/0.3 or AT-
StackOP/9.0 fiber optic transceivers, refer to “Planning a Stack” on
page 53. To cable switches with fiber optic transceivers, perform the
following procedure:
1. Remove a dust cover from either the S1 or S2 slot on the switch.
2. To install the transceiver in the S1 slot, position it with the handle on
top, as shown in Figure 34. To install it in the S2 slot, position it with
the handle on the bottom.
Figure 34. Handle on the AT-StackOP/0.3 and AT-StackOP/9.0
Transceivers
3. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 35 on page 76.
Handle