Datasheet
Table Of Contents
- Contents
- Figures
- Tables
- Preface
- Chapter 1
- Overview
- Chapter 2
- Virtual Chassis Stacking
- Chapter 3
- Beginning the Installation
- Chapter 4
- Installing the Switches on a Table or in an Equipment Rack
- Chapter 5
- Verifying the Status of VCStack
- Chapter 6
- Cabling the Stacking Ports
- Chapter 7
- Powering On the Stack
- Chapter 8
- Cabling the Networking Ports
- Chapter 9
- Troubleshooting
- Appendix A
- Technical Specifications

Chapter 6: Cabling the Stacking Ports
74
Figure 33. Installing the AT-StackXS/1.0 Transceiver in Slot S2
8. Repeat this procedure to connect additional switches to the stack with
AT-StackXS/1.0 transceivers.
9. To create the redundant path with the ring topology shown in Figure 12
on page 42 and Figure 13 on page 43, connect a stacking cable to the
empty stacking slots on the top and bottom switches.
10. After connecting the stacking cables to all the switches, go to Chapter
7, “Powering On the Stack” on page 79.