Datasheet
Table Of Contents
- Contents
- Figures
- Tables
- Preface
- Chapter 1
- Overview
- Chapter 2
- Virtual Chassis Stacking
- Chapter 3
- Beginning the Installation
- Chapter 4
- Installing the Switches on a Table or in an Equipment Rack
- Chapter 5
- Verifying the Status of VCStack
- Chapter 6
- Cabling the Stacking Ports
- Chapter 7
- Powering On the Stack
- Chapter 8
- Cabling the Networking Ports
- Chapter 9
- Troubleshooting
- Appendix A
- Technical Specifications

x510 Series Installation Guide for Virtual Chassis Stacking
73
Figure 32. Removing the Dust Plug from the S2 Slot
6. Remove the dust cover from the connector on the other end of the
transceiver.
7. Position the transceiver with the release tab on the bottom and slide it
into the slot until it clicks into place, as shown in Figure 33 on page 74.