Datasheet
Table Of Contents
- Contents
- Figures
- Tables
- Preface
- Chapter 1
- Overview
- Chapter 2
- Virtual Chassis Stacking
- Chapter 3
- Beginning the Installation
- Chapter 4
- Installing the Switches on a Table or in an Equipment Rack
- Chapter 5
- Verifying the Status of VCStack
- Chapter 6
- Cabling the Stacking Ports
- Chapter 7
- Powering On the Stack
- Chapter 8
- Cabling the Networking Ports
- Chapter 9
- Troubleshooting
- Appendix A
- Technical Specifications
Chapter 5: Verifying the Status of VCStack
68
9. Check the ID LED and do one of the following:
If the ID LED is displaying the number 1, 2, 3, or 4, VCStack is now
enabled on the switch. Power off the switch by disconnecting the
power cord and repeat the procedures in this chapter on the next
switch. If there are no further switches to test, go to Chapter 6,
“Cabling the Stacking Ports” on page 69.
If the ID LED is still displaying “0,” repeat this procedure. If the
procedure was not successful, it might be because you did not
issue the WRITE command in step 5 to save your change.