Datasheet

Table Of Contents
x510 Series Installation Guide for Virtual Chassis Stacking
55
Unpacking the Switch
Figure 15 lists the items that come with the switch. If any item is missing or
damaged, contact your Allied Telesis sales representative for assistance.
Figure 15. Components of the x510 Series Switches
Note
You should retain the original packaging material in the event you
need to return the unit to Allied Telesis.
After checking the contents of the shipping containers, go to Chapter 4,
“Installing the Switches on a Table or in an Equipment Rack” on page 57
Two rack mounting brackets
One 2 m (6.6 ft) local management cable with
RJ-45 (8P8C) and DB-9 (D-sub 9-pin)
connectors.
Eight bracket screws
Two regional AC power cords