Installation guide

SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis 121
Figure 56. Items Included with the AT-SBxPWRSYS1 DC Power Supply
Module
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
4. Verify that the On/Off switch on the power supply is in the Off position.
Refer to Figure 57 on page 122.