User Manual
Table Of Contents
- Contents
- Figures
- Tables
- Preface
- Chapter 1
- Overview
- Chapter 2
- Installation
- Reviewing Safety Precautions
- Cable Requirements
- Unpacking the AT-MCF2000M Management Module
- Setting the Chassis ID Jumper
- Installing the Management Module
- Cabling a Media Converter Stack
- Verifying the Installation
- Starting a Local Management Session
- Removing the AT-MCF2000M Management Module
- Installing a Media Converter Module
- Chapter 3
- Troubleshooting
- Appendix A
- Technical Specifications

AT-MCF2000M Management Module Installation Guide
55
Verifying the Installation
This procedure verifies the installation of the
AT-MCF2000M Management Module. The procedure
assumes the chassis with the module is powered on.
To verify the installation of the module, perform the
following procedure:
1. Verify that the Power LED on the module is green.
2. If you connected a network cable to the 10/100/
1000Base-T Management Module, verify that the L/A
(Link/Activity) LED is green or amber.
3. If you connected a cable to the Stack port, the Link/
Activity LED for the port should be steady or flashing
green.
Note
If there are any problems, refer to Chapter 3,
“Troubleshooting” on page 63 for assistance.