Installation Instructions

AT-GS950/8, AT-GS950/16, and AT-GS950/24 Switches Installation Guide
41
Figure 15. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, “Troubleshooting” on page 43.
The switch is now powered on and ready for network operations. For
information on how to manage the switch, refer to the AT-S107,
AT-S108, or AT-S109 Management Software User’s Guide.
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
E3
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
E5