Installation Instructions

AT-GS950/8, AT-GS950/16, and AT-GS950/24 Switches Installation Guide
37
Figure 11. Securing the Switch to the Wall
7. Go to “Installing Optional SFP Transceivers” on page 37 or “Cabling
the Switch” on page 40.
Installing Optional SFP Transceivers
To install an SFP transceiver, perform the following procedure:
Note
The transceiver can be hot-swapped; you do not need to power off
the switch to install a transceiver. However, always remove the
cables before removing the transceiver.