Installation guide
SwitchBlade x8112 Chassis Switch Installation Guide
97
Figure 54. Items Included with the AT-SBx81CFC400 Controller Card
Note
Store the packaging material in a safe location. You should use the
original shipping material if you need to return the unit to Allied
Telesis.
3. Move the locking handles on the front panel to the open position, as
shown in Figure 55.
Figure 55. Opening the Locking Handles on the AT-SBx81CFC400
Controller Fabric Card
4. Remove the battery insulator tab on the controller card by sliding it out
from between the battery and battery clip, as shown in Figure 56 on
page 98.
One AT-SBx81CFC400
Control Card
One 2 m (6.6 ft) local
management cable with
RJ-45 (8P8C) and DB-9
(D-sub 9-pin) connectors.