Install guide
4 AT-9800 Series
C613-04038-01 REV F
Selecting a Site
The switch can be installed in a standard 19-inch rack or on a level surface such
as a desktop or bench. When installing the switch, choose a site that:
■ Allows adequate airflow around the switch and its vents
■ Is free of dust and moisture
■ Will maintain an ambient temperature range of 0 - 40º C (32 - 104º F) and a
humidity range of 5 - 95% non-condensing.
■ Has a reliable and earthed (grounded) power supply circuit, preferably
dedicated and filtered.
■ Does not expose cabling to sources of electrical noise, such as radio
transmitters, broadband amplifiers, power lines, electric motors, and
fluorescent fixtures
■ Allows easy access to the switch’s power and cable connections
■ Will allow all related network devices to be connected to the switch
without exceeding maximum cable length limitations. See the AT-9800
Series Hardware Reference for cable length specifications
Installing the Switch
This equipment must be earthed.
Follow these steps to install the switch:
1. Read the safety information
For safety information, see the Safety and Statutory Information booklet. A
copy of this booklet is supplied with each switch, and can also be found on
the Documentation and Tools CD-ROM or at www.alliedtelesyn.co.nz/
support/at9800/.
2. Gather the tools and equipment you will need
If installing a DC version of the switch, you will need a DC power source,
DC supply cable, and ring connectors (see step 8).
If the switch is to be connected to a redundant power supply, you will need
a redundant power supply unit and cable (see step 10).
3. Choose a suitable site for the switch
Either a flat surface or 19 inch rack.
4. Unpack the switch
Verify the package contents. If any items are damaged or missing, contact
your sales representative.