User guide

Provisioning the iMG/RG Installation Procedures
817
AlliedView NMS Administration Guide
FIGURE 7-141 IMG/RG Table - iMAP Port Configured, no iMG/RG Configured
Note the following:
The Customer ID, Type (Family level), and Upstream Port are identified.
The iMG/RG IP address, software release, and associated profiles are not included. These are filled in as a result of
plugging in the iMG/RG by the customer, which begins the DHCP configuration steps.
15. End of this part of the Procedure
7.10.4.4 Install the iMG/RG and Apply Power
Note: Installation instructions are included with the iMG/RG packaging, and these should be read before continuing with this part of
the Procedure, since these instructions will include detailed pictures, a listing of cables that are used for the interface
connections, and any updates to product information.
Note: If a technician is installing the Ethernet version of the iMG/RG, a PC (laptop) can be connected directly to monitor the
progress of the iMG/RG configuration (mainly the successful allocation of addresses by DHCP). The console cable is sold
separately by ATI. Use n-8-1-38400 for the console port setting.
For this part of the procedure, do the following:
1. Ensure the connection to the customer from the iMAP connection is active.
2. Remove the iMG/RG from its packaging.
3. Connect the WAN cable to the external interface port.
4. Apply power to the iMG/RG (usually by connecting the power cable to iMG/RG and then plugging it in).
5. Note the sequence of events that shows the iMG/RG as run through its initial and reboot sequence (for details refer to
7.2.6.5).
7.10.4.5 Connect Devices and wait for Services to Begin
1. Note which ports are being used:
LAN1 to a STB for video service
LAN2 to a PC for internet service
LAN3 - Unused
TEL1 - to a telephone for voice service
TEL2 - Unused
2. Connect the devices to the iMG/RG using the appropriate cables.
3. Once connected, devices will use DHCP and the provisioned components. When finished, all devices should be providing
service. Test all devices to ensure they deliver the promised service(s).
4. END OF PROCEDURE