User guide

Configuring Network Services Creating Network VLANs
406
AlliedView NMS Administration Guide
FIGURE 6-13 Edit Ports Form
Clicking on the ports and then clicking Close adds these to the Service Ports cell that was chosen. Multiple ports may be
selected pressing the Shift or Ctrl key while clicking. The same port must not be selected in both the Tagged Ports and
Untagged Ports lists. This error will be detected when the Close button is clicked. The form will not close until the error is
corrected.
Once the VLAN Interfaces have been configured, clicking Next will invoke the Test Network VLAN form, which ensures
that the Network VLAN has the ports configured correctly so that all ports can send data to all other ports within that
Network VLAN. If there is a problem, a Problems table is added to the form, with a description, as shown in Figure 6-14.
Some errors (warnings) can be ignored. In this case, the checkbox in the Ignore column can be checked and the Network
VLAN will be created anyway. Other errors will prevent the VLAN from being created. These errors must be fixed by
backing up to the previous panels and correcting the problem.