User guide
Controlling and Provisioning Network Devices Scheduling and Controlling Provisioning Tasks
359
AlliedView NMS Administration Guide
5.8 Scheduling and Controlling Provisioning Tasks
5.8.1 One Time
When a task is to be performed one time only, the user will see the One Time Schedule type form that as the options of
having the AlliedView NMS perform the task. Refer to the following figure.
FIGURE 5-230 One-time Task Form
The user can select:
• Now - The task begins as soon as the AlliedView NMS is able to perform it.
• Hold - The task is placed in the Task List table and will never at this point be performed. The user can modify the status
of the task at a later time so that it will be performed.
• Schedule - The task will be performed at the date and time selected from the pull-downs (if the time selected is before
the current time, there is an error message.)
If the user chooses Now, the Task Details Form immediately appears, which gives the attributes, status, and options for the
task chosen. For an example, refer to the following figure.
FIGURE 5-231 Task Details Form