Installation guide
Chapter 5: Powering On the Switch
88
The base port LEDs are on in phases 1 and 2 if they are connected to live
network devices. Otherwise, they are off. The 10/100/1000Base-T port
LEDs are on in phase 1 regardless of whether they are connected to
active network devices.
You may also monitor the processes by connecting a terminal or computer
that has a terminal emulator program, to the Console port on the master
switch. You will see the messages in Figure 35 on page 89 and Figure 36
on page 90.
Table 16. LEDs and Management Software Initialization
LEDs
Initialize Management
Software
Initialize
Features
Load
Configura-
tion File
Phase 1:
15 seconds
Phase 2:
15 seconds
Phase 3:
10 seconds
Phase 4:
varies
Base port LEDs On On Off Off
10/100/1000Base-T port
and SFP slot LEDs
On Off Off Off
Stack ID LED
Power cycle Off Off Flashing On
RELOAD or
RESET command
On On Flashing On