User guide
Allied Telesis AlliedView-UM 1.6
User's Guide
PN 613-000381 Rev B
Page 121 of 129
18.2 SPECIAL
RULES ON ROLLBACKS
If the last entry in the Audit Trail is a Reboot Device operation or an Execute Script File operation, then
AlliedView-UM will locate the most recent non-Reboot Device operation entry in the Audit Trail. That
entry will be the one to be rolled back.
# AUDIT
1 Release Upgrade 1
2 Patch Upgrade 1
3 Configuration File Update 1
4 Patch Upgrade 2
5 Release Upgrade 2
6 Release Upgrade 3
7 Reboot Device
In the example above, the most recent non-Reboot entry in the Audit Trail is “Release Upgrade 3”.
“Release Upgrade 3” will be the operation to be rolled back. If the last entry on the Audit Trail is a
Rollback operation, then a Rollback cannot be performed.