User's Manual

Chapter 5: Powering On the Switch
63
2. Connect the other end of the power cord to an appropriate AC power
outlet. For power specifications for the switch, refer to “Power
Specifications” on page 82.
3. When power is applied, the switch begins to load the Management
Software. The loading process takes less than a minute to complete.
The switch is now ready for network operations.
No further installation steps are required if the default parameter
settings of the switch, listed in the AT-9000 Series Management
Command Line Interface User’s Guide, are adequate for your network.
If you want to manage the switch, refer to “Starting a Local
Management Session” on page 64.