Datasheet

AS4C32M16D1A-C&I
11
Rev. 1.0 Mar. /2015
Figure 3. SSTL_2 A.C. Test Load
DQ, DQS
Z0=50Ω
50Ω
30pF
0.5 * VDDQ
10) Power up Sequence
Power up must be performed in the following sequence.
1) Apply power to V
DD
before or at the same time as V
DDQ,
V
TT
and V
REF
when all input signals are held "NOP"
state and maintain CKE “LOW”.
2) Start clock and maintain stable condition for minimum 200s.
3) Issue a NOP command and keep CKE “HIGH”
4) Issue a Precharge All command.
5) Issue EMRS enable DLL.
6) Issue MRS reset DLL. (An additional 200 clock cycles are required to lock the DLL).
7) Precharge all banks of the device.
8) Issue two or more Auto Refresh commands.
9) Issue MRS with A8 to low to initialize the mode register.