Specifications

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Installation
F8429301 (EN)
32
6. Drill holes (refer to manufacturer’s requirements
for drill hole size) for the perimeter reinforcing
bar at a depth of 2.5 inches (64 mm) into the
existing floor. The reinforcing should be
12 inches (305 mm) on center each way around
entire perimeter.
7. Clean out debris from each reinforcing bar hole.
8. Fill half the hole depth with acrylic adhesive.
9. Using #4 (60 ksi) reinforcing bar, tie new pad to
existing floor making sure to tie reinforcing bars
at the intersections and using proper reinforcing
bar supports to hold bars at the proper depth in
the pad.
10. Allow adhesive around reinforcing bar to cure
properly, refer to adhesive manufacturer for
recommended cure times.
11. Completely fill with 3500 psi minimum concrete
up to the existing foundation level plus any added
level (maximum of 8 inch [203 mm]) for the
desired elevated pad. The concrete must be
poured so that the entire foundation and pad
cures as one piece.
12. Allow concrete to cure, refer to manufacturers
recommended cure times.
13. Using a mounting bolt template, elevated base
frame or the machine base, mark where the holes
should be drilled to mount the machine.
NOTE: As an alternate method, cast in the Grade 5
(minimum SAE rating), 5/8 inches (16 mm) for
20 - 60 pound models and 3/4 inch (19 mm) for
80 - 125 pound models anchor bolts as the concrete
is poured, refer to Figure 37. Ensure that the bolt
threads extend a minimum of 2.5 inches (64 mm)
above floor level and a minimum of 3.5 inches
(89 mm) for 20 - 60 pound models and 5.5 inches
(140 mm) for 80 - 125 pound models if the bolt is
embedded in concrete.
14. Proceed to Machine Mounting and Grouting
section.