Service manual

39201 77
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
Disconnect electric power to the washer before servicing.
Never start the washer with any guards/panels removed.
Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the washer is properly grounded.
W003
WARNING
© Copyright, Alliance Laundry Systems LLC DO NOT COPY or TRANSMIT
p. Carefully place complete tub module back into
washer making sure the weldment assembly is
positioned properly over the friction ring and
the recess area of washer base.
IMPORTANT: When reinstalling complete tub
module, carefully set the tub module pivot dome on
top of friction ring. DO NOT ALLOW TUB
MODULE TO BE DROPPED OR LOWERED
INTO POSITION TOO HARD! This can damage
or crack the friction ring.
NOTE: Be sure the motor and pump are facing
toward front of washer.
q. Use the No. 289P4 Spring Hook Tool and
staring with the rear springs, hook 6 module
springs into lower edge of outer tub. Refer to
Figure 53.
IMPORTANT: When installing module springs,
make sure spring hook is fully seated in hole in tub
skirt. Refer to Figure 53.
r. Connect hose to pump, then tighten hose clamp.
s. Reconnect the connection block to motor
switch. Refer to Figure 43. Reinstall cable tie in
leg making sure it is secure.
t. Reconnect pressure hose to pressure bulb.
Refer to Figure 61. Then connect filler hose to
tub cover. Refer to Figure 61.
NOTE: When reinstalling filler hose, white line on
hose must point toward front of washer. Refer to
Figure 61. Make sure hose is in its natural position
(not kinked or twisted). If hose is not, loosen hose
clamp and straighten hose.
u. Reinstall cabinet top and washer front panel.
v. Reconnect washer power cord and open water
supply faucets.
NOTE: Washer must be run through a complete
cycle to make sure it is operating properly.
Figure 60
W454SE3B
WASHER
BASE
FRICTION
RING