Service manual
78 505894
Section 7 Test Procedures
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
69. ELECTRICAL CIRCUIT TO IGNITION
SYSTEM (Gas Models)
a. While supporting the access panel, remove two
screws from bottom edge of access panel. Refer
to Figure 7.
b. Gently lower the access panel to disengage
locators from bottom edge of front panel. Refer
to Figure 16.
c. Close main gas shut-off valve. Refer to
Figure 42.
d. Remove valve wire harness disconnect block
from the holding and booster coil. Refer to
Figure 48.
e. Plug dryer power cord into wall receptacle, and
start the dryer in a heat setting (refer to the
Operating Instructions supplied with dryer).
f. Set test meter to read AC voltage and apply
meter probes into terminals on the dryer
harness plug that would correspond to
terminals "1" and "2" on the coil. Figure 47.
Meter should register line voltage in all Fabric
settings, except NO HEAT/AIR FLUFF which
should read “zero” VAC.
g. If meter does not read line voltage in step “f”,
check motor switch, thermostats, fabric switch,
accumulator, or timer.
70. GAS VALVE COILS CHECK (Gas Models)
a. While supporting the access panel, remove two
screws from bottom edge of access panel. Refer
to Figure 7.
b. Gently lower the access panel to disengage
locators from bottom edge of front panel. Refer
to Figure 16.
c. Close main gas shut-off valve. Refer to
Figure 42.
d. Remove disconnect blocks from gas valve
coils.
e. Set test meter to read Ohms and put meter
probes to terminals shown in Figure 48, and in
the following chart.
Silicon Carbide Ignition:
COIL TOLERANCE READINGS
Silicon Nitride Ignition:
Both coils should read between 2400-2800
Ohms.
NOTE: If meter registers any other readings than
those listed above, the respective coil(s) should be
replaced.
To reduce the risk of fire, explosion and
electric shock, close the valve in the gas
supply line to the gas dryer and disconnect
the electrical power unless gas or power
supplies are required to perform test
procedure.
W263
WARNING
Meter probes to terminals: Meter should read:
Holding Coil – Terminals 1 & 2 1700 ± 285 Ohms
Booster Coil – Terminals 1 & 3 685 ± 115 Ohms
Secondary Coil – Terminals 4 & 5 1680 ± 285 Ohms