Specifications

Installation
Gas Requirements
Gas Dryers
NOTE: The gas service to a gas dryer must
conform with the local codes and ordinances, or in
the absence of local codes and ordinances, with the
latest edition of the National Fuel Gas Code ANSI
Z223.1/NFPA 54 or the CAN/CGA-B149, National
Gas Installation Code.
Natural Gas, 1000 Btu/ft 3 (37.3 MJ/m 3) service must
be supplied at 6.5 + 1.5 inch water column pressure.
For proper operation at altitudes above 2500 feet
(760 m) the natural gas valve spud orifice size must be
reduced to ensure complete combustion. Refer to
Table 1.
L.P. (Liquefied Petroleum) Gas, 2500 Btu/ft 3
(93.1 MJ/m 3) service must be supplied at 10 + 1.5 inch
water column pressure.
NOTE: DO NOT connect the dryer to L.P. Gas
Service without converting the gas valve. An LPK1
Sales Accessory (L.P. Gas Conversion Kit 649P3)
must be installed.
NOTE: The dryer and its appliance main gas valve
must be disconnected from the gas supply piping
system during any pressure testing of that system
at test pressures in excess of 0.5 psi (3.45 kPa).
The dryer must be isolated from the gas supply piping
system by closing the equipment shut-off valve during
any pressure testing of the gas supply piping system at
test pressures equal to or less than 0.5 psi (3.45 kPa).
NOTE: When connecting to a gas line, an
equipment shut-off valve must be installed within
6 feet (1.8 m) of the dryel. An 0.125 inch NPT pipe
plug must be installed as shown. Refer to Figure 18.
Natural Gas Altitude Adjustments
Altitude
feet m
3000 915
6000 1830
8000 2440
9000 2740
10000 3050
Orifice Size
# inches mm
43 0.0890 2.26
44 0.0860 2.18
45 0.0820 2.08
46 0.0810 2.06
47 0.0785 1.99
Part No.
503778
58719
503779
503780
503781
Table 1
WARNING
To reduce the risk of gas leaks, fire or
explosion:
The dryer must be connected to the type
of gas as shown on nameplate located in
the door recess.
Use a new flexible stainless steel
connector.
Use pipe joint compound insoluble in L.P.
(Liquified Petroleum) Gas, or Teflon tape,
on all pipe threads.
° Purge air and sediment from gas supply
line before connecting it to the dryer.
Before tightening the connection, purge
remaining air from gas line to dryer until
odor of gas is detected. This step is
required to prevent gas valve
contamination.
Do not use an open flame to check for
gas leaks. Use a non-corrosive leak
detection fluid.
W309