Instruction manual

© Published by permission of the copyright owner – DO NOT COPY or TRANSMIT
Testing Machine and Electronic Control Functions
91
802953
Production Test Cycle
To Enter Production Test Cycle
1. Be certain control is in Ready Mode and access
panel or coin vault is open.
2. While pressing and holding the NORMAL 40
keypad with one hand, press the PERM PRESS
60 keypad with the other hand.
3. When the control enters the Production Test
Cycle, it will first display “SXX” with the “XX
showing the software version of the control.
4. The control will advance through the sequence of
test steps whenever START (enter) is pressed,
with the exception of the Keypad Test. Refer to
Table 18 for all tests in the Production Test
Cycle.
To Exit Production Test Cycle
To exit a test step, press START (enter) unless
otherwise noted in Table 18.
Table 17 (continued)
CONFIG
VALUE
COIN HEADER
PRESENT
NETWORK
BOARD
PRESENT
CARD
READER
PRESENT
COIN DROP
#2
PRESENT
COIN DROP
#1
PRESENT
88 ON ON OFF OFF OFF
89 ON ON OFF OFF ON
90 ON ON OFF ON OFF
91 ON ON OFF ON ON
92 ON ON ON OFF OFF
93 ON ON ON OFF ON
94 ON ON ON ON OFF
95 ON ON ON ON ON
NOTE: Configuration values 80-95 are on software version “S 02” or higher only.
Table 17