Technical data
1A
OPERATIONS
1.21 Transporting Trowel
Optional dolly jacks are available for short moves or to
aid in servicing the trowel. Install dolly jacks as follows:
1. Inspect dolly jack for serviceability and damage.
2. Place riding trowel on firm level ground.
3. Tie steering levers (I) to frame to prevent them from
tipping forward when trowel is being lifted.
4. With the front dolly jack (J) Fully insert extension
tube in the holes (K) in the mainframe of the
riding trowel.
The front dolly jacks are equipped with short lifting
tubes while the rear dolly jacks have long
lifting tubes.
5. Insert the rear dolly jacks(L) with the long lifting
tubes into the holes provided in the rear of the
mainframe. The holes in the mainframe are located
directly opposite the front holes.
6. Turn jack handles clockwise to lift trowels and count-
er-clockwise to lower trowel.
CAUTION:
The dolly jack lifting system is designed for short moves
and to aid in servicing the trowel. It is not a substitute for
a towing system or trailer. An optional lifting bridle (M) is
available and recommended for lifting the trowel. Attach
the bridle to each of the four lifting eyes (N) on the trow-
el.
I
K
M
N
J
L
1A-17