User`s manual

7 - 5 7 - 5
MELSEC
7 UTILITY OPERATION
7.2 CC-Link Utility
This section explains how to operate the CC-Link utilities.
7.2.1 Operation procedure
The following explains the operation procedure for the CC-Link utilities.
· · · · · ·
· · · · · ·
· · · · · ·
· · · · · ·
· · · · · ·
· · · · · ·
· · · · · ·
Start
Connect a PC to CC-Link.
Perform settings using the CC-Link utilities.
Perform settings using the board
information screen.
Confirm the host line status using the
network monitor screen.
To check the list of boards, use the
information screen.
To confirm the line status of other
stations, use the station's link status screen.
To perform a diagnosis of the memory and
I/O and board reset use, the memory I/O
test screen.
To perform a network test, use the network
test screen.
End
See section 5.1.
See Section 7.2.3.
See Section 7.2.4.
See Section 7.2.2.
See Section 7.2.5.
See Section 7.2.6.
See Section 7.2.7.
To access a multiple PLC system,
set the logical station number in the
target screen.
· · · · · ·
See Section 7.2.8.