Instruction manual
Installation and Operation
CC/CCS Power Conditioner User Manual 7
Electrical Code and any local codes.
2. With the ON/OFF switch in the OFF
position, plug the conditioner into the
receptacle at the power conditioner’s
desired location. The conditioner should
be as close as possible to your equipment.
3. Follow the procedure in the section
Verifying Your Installation on page 4.
4. Turn the power conditioner OFF and refer
to Installation: Output Connections.
Hardwire input connected models
1. Wire in accordance with the U.S. National
Electrical Code and your local codes.
WARNING : Turn off the main power source
supplying the power conditioner at the service
disconnect before proceeding.
WARNUNG: Vor dem nächsten Arbeitsschritt
muß die Hauptnetzversorgung zum
Leistungsanpassungsgerät am
Wartungstrennschalter abgeschaltet werden.
2. For Model CCxx48 units, remove the unit
cover to expose the input terminal
connections. For all other CC and CCS
Series, remove the cover on the rear panel
to expose the input terminal connections.
3. Place the input conduit through the bottom
or side knockout hole.
4. Connect the input equipment grounding
conductor to the terminal block (G).
Heavy gauge wire, equal to or larger in
diameter than the power carrying
conductors should be used to connect this
safety ground. It is recommended that
ground be wired back to the service
ground.
5. Do not rely on the conduit alone for
connection to ground. ONEAC
discourages the down sizing of grounding
conductors as allowed by various codes. If