Instruction manual

Installation and Operation
CC/CCS Power Conditioner User Manual 5
ONEAC power conditioners output
voltage may run a few volts higher than the
rated value until the load is switched on.
5. If there is power at the input with no power
at the output;
Turn OFF the main input circuit breaker.
Turn OFF the main power source
supplying the power conditioner.
Follow the procedure in Troubleshooting
an Installation on page 26.
Installation and
Operation
Your ONEAC power conditioner is delivered in
a protective package. Upon arrival, inspect the
unit and the package for signs of damage. If
damage is detected, immediately contact the
freight company and ONEAC Technical
Services. You can reach ONEAC Technical
Services at 1-800-327-8801, option 3 or at
1-847-816-6000.
ONEAC recommends that your power
conditioner be left in the package during
handling. Remove the conditioner from the
package once it is as close as possible to its final
installation location.
The actual physical placement of the power
conditioner should be as close as possible to
your equipment. The power conditioner should
be installed inside the room containing your
equipment. Allow at least 2 inches (5.0 cm)
around all sides of the ONEAC power
conditioner. Do not allow the conditioner to be
installed where direct contact with water is
possible.
Once the location of your power conditioner has
been determined, carefully remove the unit
from the package and put it into place.
Unpacking and
Placement