Owner's manual

5
Portable Calibration Unit
Thank you for purchasing an Alicat Scientic Portable Calibration Unit (PCU). Please take the time to
nd and read the information contained in this manual. This will help to ensure that you get the best
possible service from your instrument.
The Alicat Scientic Portable Calibration Unit (PCU) is designed to accurately measure gas ow rates
of common gases with three separate ow meters with ranges determined by the end user’s needs.
The laminar ow, differential pressure ow meters housed in the PCU are accurate and exceptionally
repeatable devices, making the PCU an excellent portable secondary standard for eld owmeter
calibration.
The PCU’s three separate displays allow you to monitor Temperature, Absolute Pressure, Volume Flow
Rate, and Mass Flow Rate simultaneously. The PCU is also equipped with an RS-232 output port that
can be connected to a computer or other data-logging device.
The Alicat PCU is designed for CLEAN, DRY, NON-CORROSIVE gases.
Connecting the PCU
The inlet and outlet connections to the PCU are located below the displays for their respective ow
ranges (Figure 1).
Inlet connections are located on the left and the outlet connections are located on the right (Figure 1.)
The connections are either 1/8”, 1/4”, 3/8” or 1/2” push-connect style tubing ttings with each tting
corresponding to a single ow range. Use appropriately sized plastic tubing to connect the ow source
to the corresponding inlet tting. If necessary, connect the corresponding outlet tting to the original
source destination with proper tubing.
CAUTION: Push-connect ttings are easy to use, as no special tools are required to make the joints.
However, special attention must be paid when cutting the tube as the O-ring inside of the
ttings can easily be damaged.
It is essential to use the correct cutter such as a pipe slice for copper pipe or dedicated plastic pipe
cutters for plastic tube Do not use a saw because any burrs left on the tube can damage the
O-ring and cause the joint to leak!
Cut your tube to the required length using the dedicated plastic pipe cutters, making sure you
have a straight cut with no burrs. Then push the tubing carefully into the tting on the bulkhead
panel.
Softer polyurethane tubing will work best, as opposed to some of the harder plastic tubings available.
It decreases the chances of damaging the O-rings.
CAUTION: If the outlet ttings are not connected to your piping, the gas being measured will
vent to atmosphere at the outlet ttings! Use protective eyewear!
Never Vent Flammable Gases To Atmosphere!