Built In Installation Instructions
2 
ALF-PZA-BIA KIT FOR BUILT IN CONSTRUCTION 
KIT INSTALLATION: 
Once you have removed all the packing material that your Alfresco™ Pizza Oven was shipped with, 
the built-in BIA-Kit can be installed on the unit. The Built-in conversion Kit consists of 3 items: 
•  A high pitched top cover 
•  A Type B, adjustable, double-walled vent pipe 
•  A Type B vent cap. 
The  installation  can  be  done  by  simply  removing  the  top 
cover of the ALF-PZA unit and replacing it with the built-in 
hood. 
•  Remover the top by lifting straight up. (Do not remove 
the top radiant stone, it’s designed to stay there) 
  (See Figure # 1) 
•  Install the BIA-Kit Hood by laying it on top and sliding 
forward until  all the  screw holes  located in it’s sides 
and back line-up correctly with the holes in the body 
of the ALF-PZA. 
  (See Figure # 2) 
•  Fasten all 9 self tapping screws to permanently fix the 
BIA Hood to the body of the ALF-PZA Unit. 
Once the BIA Hood is installed, it should look like 
Figure  #  3. The vent flue and vent cap (TYPE B 
Rated)  will  be  added  later  during  construction  of 
the non-combustible built-in enclosure. 
Figure # 1 
TOP COVER 
ALF-PZA UNIT 
LIFT UP 
BIA HOOD 
F
O
R
W
A
R
D
D
O
W
N
Figure # 2 
Figure # 3 
VENT CAP 
VENT FLUE VENT FLUE 
SCREWS 
AROUND 
PERIMETER 






