Use and Care Manual
OPERATION
CHECKLIST
Operation
Checklist
For
a safe and
pleasurable
heating
experience,
perform
this checklist
before
each use.
Before
Operating:
1.
I am familiar
with
entire owner's
manual
and understand
all
precautions
noted.
2. All
components
are
properly
assembled,
intact
and operable.
3. No
alterations
have
been made.
4.
All
gas
connections
are secure
and do not
leak.
5.
Wind velocity
is below 10
mph.
6.
Unit will operate
at reduced efficiency
below 40 F/4.44"C
7. Fire
pit
is outdoors
(outside
any
enclosure).
8. There is
adequate
fresh air ventilation.Do
not use
this appliance
if any
part
has
been under water.
lmmediately
call a
qualified
service
technician
to inspect
the appliance
and
to replace any
part
of
the
control system
and
gas
control
which
has been
under water.
9.
Fire
pit
is
away from
gasoline
or
other flammable
liquids
or vapors.
10.
Fire
pit
is away
from windows,
air intake
openings, sprinklers
and other water
sources.
11
. Fire
pit
is
at least24
in. on rear
and
at least 24 in.
on sides
from
combustible materials.
12. Fire
pit
is on
a hard and level
surface.
13.
There
are no
signs of spider
or insect
nests.
14.
All burner
passages
are clear.
15.
All air circulation
passages
are clear.
16. Children
and
adults should
be
alerted
to the hazards
of high
surface
temperatures
and should
stay
away
to avoid
burns
or clothing ignition.
17.
Young
children
should be
carefully
supervised
when
they are
in the
area of the fire
pit.
18. Clothing
or
other
protective
material
should not be
hung from
the
fire
pit,
or
placed
on or near
the
fire
pit.
19.
Any
guard
or other
protective
device
removed
for servicing
the
fire
pit
must
be replaced
prior
to
operating
the fire
pit.
20.
lnstallation
and repair
should
be done
by a
qualified
service
person.
The fire
pit
should be inspected
before
use
and at least
annually
by
a
qualified
service
person.
21.
More
frequent
cleaning may
be
required
as necessary.
lt is imperative
that control compartment,
burner
and
circulating
air
passageways
of the fire
pit
be kept
clean.
1. Gas
control
is in OFF
position.
2.
Gas
Tank valve
is OFF.
3. Disconnect
Gas line.
4.
After
each use,
replace cap
on
tank.
PREPARATION
Before
beginning
assembly
of
product,
make
sure all
parts
are
present.
Compare
parts
with
package
contents
list and hardware
contents above.
lf any
part
is
missing
or danraged, do not
attempt
to
assemble
the
product.
Contact
customer
service for
replaeement
parts.
Estinnated
Assembly
Time: 60
minutes
Tools
Required for
Assembly(not
included)
:
Leak
Detection
Solution.