Installations

9
1
2
3.A
.er
nnecting
hot
and
Id
supply
,
tum
on
mixer
to
check
for
leakage
with
testing
water
p
ssure
~
1.6MPa
32psi).
After
testing
,
install
protective
ring(
11)
onto
the
base
,
then
,
fumish
the
floor
according
to
e
nstruction.
Remove
the
I
1
4.lnstall
the
mainbody(1)
as
shown
on
the
Fig.
Fix
the
main
pro
ctive
ri
吨,
screws(3)
,
spring
gas
阳恼
(4)
protective
board
l
I
body
on
the
base
with
screws
and
spring
gaskets.
(5)
and
rubber
plugs(6)
when
the
cement
is
dry.
I
5.Tighten
screws(3)
with
allen
key(12).
Then
nnect
hand
1
6.Check
for
leakage
after
installation.
Finally
,
push
down
showe
r(
9)
and
Main
body
with
shower
hose(10).
I
the
decorative
plate
(2)
close
to
floor.
-3-