Instructions / Assembly
AC2000 SLIDING GATE OPERATOR
5. Installation
The AC2000 Chain-driven Gate Operator operates by forcing a straight piece of chain. This
length of chain is extended between two chain brackets located at opposite ends of the gate.
The entire configuration is shown in the diagram below.
Fig.1
Conduit
In order to protect the wires, conduit must be preset into the concrete when it is poured. Wires
within the conduit shall be located or protected so that no damage can result from contact with
any rough or sharp part.
Concrete Pad
The base unit of the gate operator requires a concrete pad in order to maintain proper stability.
The concrete pad should be approximately 300mm x 260mm x120mm deep in order to provide
for adequate operation.
Once the gate is mounted adequately, electrical power is available, and the concrete pad is
poured, you are ready to proceed.
Anchors
You can use the anchor bolts, anchors, washers, and nuts see Fig.2. These anchors must be
set into the concrete when it is poured, or you can use wedge anchors.
Operator Bracket
Mount the gate operator bracket to the concrete pad. The distance between the gate and the
bracket should be no more than 64mm. Verify that the operator is leveled properly.
5