Specifications
10
170314-20 AL6B
Firebrick Installation Instructions
This package contains 19 full-size rebricks, as well as 5 various cut bricks.
With the woodstove in the upright position, install rebricks as follows:
1. Place the rebricks on the bottom of the unit rst. Use a total of 6 full-size (D)
and 5 cut bricks (A, B, C & 2E) with ash cleanout system.
2. Next install the side rebricks, 3 full-size and 2 cut rebricks(F) on each side
of the rebox as shown.
3. Finally install 4 full-size bricks against the rear wall as shown.
ITEM SIZE
A 38mm X 114mm X 32mm
B 102mm X 114mm X 32mm
C 184mm X 114mm X 32mm
D 229mm X 114mm X 32mm
E 229mm X 114mm X ANGLED CUT
F 229mm X 89mm X 32mm
B
F
E
C
A
D
F